This coming week goal is
1) main door install
2) hvac finish
3) air system finish (3 hours left on it)
4) start moving in some stuff.
*clue* The tape over all measurement is 90.5" x 85"
1) main door install
2) hvac finish
3) air system finish (3 hours left on it)
4) start moving in some stuff.
*clue* The tape over all measurement is 90.5" x 85"
Last edited: